Results 1 to 2 of 2

Thread: Nautilus 2010

  1. #1
    Join Date
    Jun 2012
    Location
    Rhode Island
    Posts
    4

    Nautilus 2010

    Gentlemen, I am trying to familarize myself with the DOE aspect of Nautilus and was wondering what your thoughts were on a coulpe of things.


    1.On the Define Variables page , what's being looked for in the Precision box? I'm not sure if I should put the # of decimal places desired or the increments of change from one experiment to another.

    2. On the Qualitative box , it's asking for Least desirable and Most desirable. Is this for a rating (1-10 where 1 is least and 10 is most) or something else?


    We are a TPE manufacturer and I want to be able to use the program with our customers, so any suggestions you can give would be greatly appreciated.

  2. #2
    Join Date
    Aug 2011
    Posts
    625

    Re: Nautilus 2010

    Hi,

    Precision - This is the minimum amount of change in the parameter that you think will make a change in the quality of the part. For example, what is the minimum change in the amount of holding pressure you think will make a difference in the part? Will changing 1 psi make a change? In theory yes, but in practicality at least a 50 psi change is required to see a noticeable difference. So the precision value is 50. For cooling time I use 1 second, mold and melt temps I use 5 deg F. This number will also show up as increment steps after you do the analysis and look at the prediction equation tabs - both numeric and visual.

    Qualitative - What is the most desirable? = Zero Splay - Least desirable = 5 (or any other number you prefer).

    Let me know if this helps.
    Thanks,
    Suhas

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •