Hello everyone,

We're running a job that requires us to install inserts after the parts are molded. We have confirmed the hole dimensions are to the specifications that Penn Engineering have called-out, but we are getting plastic pushing up and out of the part during installation. Can anyone give me an idea of what we can do to stop this?