Results 1 to 2 of 2

Thread: crack in production

  1. #1
    Join Date
    May 2021
    Posts
    1

    crack in production

    Hi everyone...
    we have an issue in SAN cylindrical housing used for the first stage of water filter ..
    there are a crack appear on 10% of the production after the injection molding process completed, may be after one day to one month without any load.
    i.e. when we store the production without any load we find around 10% of the production has a crack
    we think that crack due to residual stress....if that right how we reduce this problem.
    thanks for help
    Attached Thumbnails Attached Thumbnails SAN Crack.jpg  

  2. #2
    Join Date
    Aug 2011
    Posts
    624

    Re: crack in production

    Hello Hassan,
    Where is the gate?
    Is the crack in the same place all the time?
    Suhas

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •