-
25th February 2020, 05:49 PM
#1
Re: Three resin lots required for part qualification
I've run 3 lots of resin many times, but only if customer requires it.
The work-around is justification of a robust processing window. The argument is if you qualify a higher injection speed + higher pack pressure and a lower injection speed with lower pack pressure (among other parameters) you've covered your basis of any lot variability you might encounter
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules