Carriage, screw & injection rams:
560
Rear of machine:
561
BTW: in the pictures of the barrel and screw/carriage the guards have been removed temporarily.
So, my main questions:
Type: Posts; User: Chuck H; Keyword(s):
Carriage, screw & injection rams:
560
Rear of machine:
561
BTW: in the pictures of the barrel and screw/carriage the guards have been removed temporarily.
So, my main questions:
These are the screens I used to manually activate all the machine functions to see if they worked:
555
556
Some pics of the machine:
Clamp and rotary table:
558
Nozzle:
I have worked through the issues mentioned in my previous thread http://www.injectionmoldingonline.com/forum/showthread.php?t=1441
After getting it to clamp down on a block of aluminum I turned on...
I made a bit more progress. I removed and cleaned the pressure relief and check valve that make up the "counter balance valve" (on left page above just under the "Clamp Motion" valve). Either I...
*** Usually when the battery dies on the AB CPU, you will lose the entire PLC program, not only the setup. Also this is likely a retrofit job done by some previous company, just looking at photos on...
Hyd diagram (left part of page) ... I am dealing with the "Jack Cylinder"
546
(Right part of page)
547
Hi Bryan, thanks for the reply ...
***Just looking at the panel pic it looks to me the slow close 1 and 2 positions are not correct, as the clamp is closing on fast close it will reach the slow...
I acquired a Trueblood TB 30B-1.1 screw-type molding machine ... basically free except for the cost of trucking it to my home.
It is controlled by an Allan Bradley SLC-503 and an Allan Bradley 550...