Hi,
No leaks. Potentially condensation. Tool temp it 60c both FH - MH. Residence time is approx 5mins across barrels of 105mm and 80mm. Yes, already tried the increased temp and time. It’s so...
Type: Posts; User: Kayl33; Keyword(s):
Hi,
No leaks. Potentially condensation. Tool temp it 60c both FH - MH. Residence time is approx 5mins across barrels of 105mm and 80mm. Yes, already tried the increased temp and time. It’s so...
Course, yes. Drying temp is 85c dehumidifier dryer. Barrel temps are at 275-295 melt is around 280c all within material data sheet. Moisture check on material checked pre moulding sub 0.18 again...
Major issues with what seems like splay marks. Material way in spec in terms of moisture. When purging excess steam comes out of the feed - no manifold leaks present. Any ideas??
This is seen...