The Injection Molding Online Forum
>
Injection Molding
>
General Injection Molding
> Screw & Barrel Change on a 300 ton VanDorn Classic Toggle
PDA
View Full Version :
Screw & Barrel Change on a 300 ton VanDorn Classic Toggle
MNDesign81
1st November 2018, 09:28 PM
Can someone give me an idea how long it should take?
Thanks in advance.
Josue
4th November 2018, 04:13 PM
1 shift , 12 hours in normal conditions,
BR
MNDesign81
5th November 2018, 11:20 PM
Great.
Thank you!
Mike
Powered by vBulletin® Version 4.2.3 Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.